My Business Guide

Before a Loading Gig, Walk the Route Empty-Handed

Ask for the load list, inspect the route, and agree on when to stop before accepting a loading or event teardown gig.

A teardown gig says “move boxes to the van.” The short route in the listing may turn out to cross a busy driveway or include stairs between the venue and the curb. Before you touch a box, find out how the load is supposed to travel and who can change the plan if the route isn’t safe.

Ask for a load list and a walk-through

Request weights and dimensions, especially for the bulkiest item, and ask whether anything is unstable, sharp, or awkward to grip. Confirm the number of trips, the surface, any stairs or ramps, and what equipment and trained help are available. On site, walk the entire route empty-handed. Look at lighting, wet surfaces, door clearances, vehicle traffic, and where boxes will be set down. If pedestrians or vehicles will be using the same space, get a workable separation plan from the site contact before you start.

The NIOSH ergonomic guide to manual material handling is a U.S. reference for reducing the demands of this kind of work. Weight alone doesn’t tell you whether a job is suitable: reach, frequency, grip, and the path all matter. InfoWeb Manutention’s handling and logistics coverage offers French-language industry reading; it is not a source for U.S. site rules or equipment authorization.

Agree on what stops the job

I’m available for the listed cartons on the agreed route. If an item is heavier or bulkier than described, the cart isn’t suitable, or the route becomes unsafe, I’ll stop and check with the site lead before continuing.

Ask for a safer route, a different work method, or qualified help. Don’t operate powered equipment you aren’t trained and authorized to use, and don’t improvise with a cart that isn’t suited to the load or surface. If the site can’t fix the problem, decline that part of the work. A time slot or flat fee isn’t a reason to accept a different job than the one you evaluated.